Finalization of the Interreg France-Wallonia-Vlaanderen VALDEM project
- Benjamin Constant

- Jan 27, 2022
- 1 min read
👉For three years, the project team developed processing methods to #recover brick/concrete waste from demolitions.
💡 Neo-Eco participated in the separation tests and carried out #environmental monitoring of the formulations developed by IMT Nord Europe and the University of Liège, incorporating brick fines and earth fines as a substitute ♻ for natural raw materials.
✔Since the monitoring guaranteed the environmental safety of the boards, this ensured their removal from waste status, and the #ecomaterials can now be marketed. 👏
Thanks to the Representation of the European Commission in Belgium for the video produced 👍.
With: CTP (Centre Terre et Pierre asbl), GreenWin, Pôle TEAM2, CD2E, ARMINES, INISMa - Soil study - Interuniversity Institute of Silicates, Soils and Materials, ULiège - Business Interface, IMT Nord Europe
.png)


